AmmoCat Construction LLC

Six passes, one grade book

Tracked work, measured twice, Moving

AmmoCat Construction LLC runs a tracked fleet for trenching, grading and site cuts across the Mona valley from the yard at 102 N Hillside Dr, Mona - 84645-3339, United States (US). Every pass below is quoted on machine hours, depth and haul distance, so the estimate reflects the dirt rather than a number pulled from a spreadsheet.

We schedule the passes in the order the site can actually support them. Request a site walk

Each pass starts on a string line

Blade at angle, grade on the reference

Start with a measured site prep estimate

How the six passes fit together

One crew, one sequence, one set of stakes

Trenching usually runs first, because the utility runs dictate where the pads and haul roads can sit. Once the trenches are cut and logged, the blade shapes the pads, the track road follows the haul route, and the cut and fill model balances the surplus. Backfill closes the trenches once the pipe crew signs off, and the estimate ties every one of those steps to a measurable quantity.

Because the same crew stays on site through the whole sequence, depths are not re-established and machines do not need to be re-mobilized between trades. Ask about a combined schedule

Service detail

What each pass includes on a tracked job

Site Trenching Runs

Site trenching runs cover water service, power conduit, gas mains, drainage and low voltage runs cut to the depth shown on the drawings. Our tracked trencher is sized so that the spoil can be placed on one side of the trench and the pipe crew can work on the other side without stepping over a windrow. We cut to a laser on the stick, check depth at intervals along the run, and log every reading against the station number. Where the ground carries water, we trench in shorter runs and backfill behind the crew the same day so the excavation does not open up overnight. Crossings are hand-potholed first so that existing services are confirmed before any chain turns.

Grading and Leveling

Grading and leveling shapes building pads, parking aprons, equipment yards and landscaping surfaces to a tolerance that drainage and concrete crews can work from. The blade works at an angle to the machine so that material rolls rather than pushes, which keeps the finish tighter and reduces the number of passes. We establish a grade reference before the first cut and re-check it after every lift. Pad edges are cut back to a clean shoulder and the surface is crowned away from the structure. Before handoff we run a level over the pad and provide the readings so the next trade can verify the surface independently.

Track Road Building

Track road building creates haul roads and temporary access tracks that will not collapse under a loaded machine in wet weather. We strip the organics, shape the subgrade, place native or imported base material where the soil needs it, and crown the running surface with shallow side ditches. Turnouts and passing bays are cut in at blind corners, and the road width is set against the widest machine that will use it. Final shape is rolled and re-checked for cross fall, and we note the ditch depth so the client can confirm that runoff will leave the track in the direction intended.

Cut and Fill Balancing

Cut and fill balancing models the site before a machine moves. We take spot levels, compare the design surface against existing ground, and work out how much material can stay on site rather than travel by truck. Where the balance allows, surplus is stockpiled in a location that can be recovered later for backfill or landscaping. We record volumes as the work progresses so the client can see whether the site is tracking to the model. Balancing is not only about cost; it also reduces haul traffic through neighboring streets and keeps the working platform stable.

Trench Backfill Programs

Trench backfill programs place and compact material in lifts that suit the specification for each run. Select fill is used where settlement would damage the surface; native material is used where the spec allows and the moisture content is controlled. Lifts are tracked in with the machine and checked by hand where the trench is narrow. We photograph the lift counts and the compaction readings, then finish-grade the surface so the trench sits flush with the surrounding yard. Return visits for settlement checks are built into the program rather than treated as an extra.

Site Prep Estimates

Site prep estimates are measured, not guessed. We walk the site with the drawings, take depths and distances on the ground, note the access constraints and the utility locates, and price the machine hours, trucking, compaction and small extras separately. The estimate lists assumptions so the client can see which conditions would change the number. We send the written estimate within two working days of the walk, and we are happy to break out a single pass if the site is being staged across several seasons.

AmmoCat Construction LLC opens its spring cut calendar for drive approaches, utility runs and building pads across the Mona valley.